This is my 70th blogspot post for our individual specialist project.
Continued from where I had left off ...
Today (November 18th 2015) - Post production
I continued working on the post production
for my pitch video trailer.
Today I was able to finish re-animating
the text of introduction to the trailer.
From there I complied the shot and exported it out
in after effects.
It seems that when I exported it out
something didn't seem to the right with the sound files
to which i had to cut off some parts off to the dialogue and
the music itself was louder than it should be (lower than the dialogue).
When I sync the png files with the dialogue it was off
the animation was playing at 30 frames per second to which it was
supposed to be playing at 25 frames per seconds.
I exported the png files as 1920 x 1080 to which it supposed to be
the same file size as the flash file that way the
images will sync up to the dialogue perfectly
So currently I am now re-exporting
all the shots as png files in the right dimensions
and re-exporting them out again in after effects.
Plan for the rest of the day:
Is to re-export all the shots as pngs.
So that tomorrow I can re-import them into after effects
and have them sync up with the dialogue.